Northrop Grumman Techniques Corp., Linthicum, Maryland, is awarded a $245,789,116 modification for the firm-fixed-price portion of a beforehand awarded contract. The entire cumulative face worth of the contract is $963,173,943. This modification supplies for the train of 5 possibility contract line objects to obtain eight Floor/Air Process Oriented Radar techniques, and related spares, information, and journey in assist of Program Govt Officer Land Techniques, Quantico, Virginia. Work might be carried out in Linthicum, Maryland, and is anticipated to be accomplished in January 2025. Fiscal 2022 procurement (Marine Corps) funds within the quantity of $245,789,116 might be obligated on the time of award and won’t expire on the finish of the present fiscal 12 months. The contract modification was not competitively procured. The Marine Corps Techniques Command, Quantico, Virginia, is the contracting exercise.
The AN/TPS-80 Floor/Air Process Oriented Radar (G/ATOR) is america Marine Corps subsequent technology Air Surveillance/Air Protection and Air Site visitors Management (ATC) Radar. The cell lively electronically scanned array radar system is at present being developed by Northrop Grumman and was anticipated to succeed in preliminary working functionality in August 2016. The Floor/Air Process Oriented Radar (G/ATOR) is a single materiel resolution for the cell Multi-Function Radar System and Floor Weapons Finding Radar (GWLR) necessities. It’s a three-dimensional, quick/medium vary multi-role radar designed to detect unmanned aerial techniques, cruise missiles, air respiratory targets, rockets, artillery, and mortars. G/ATOR satisfies the warfighter’s expeditionary wants throughout the Marine Air-Floor Process Pressure spectrum changing 5 legacy radar techniques with a single resolution.
Commercial
Growth of the G/ATOR started in September 2005 when the Marine Corps awarded a $7.9 million contract to Northrop Grumman Digital Techniques. Preliminary design necessities required planning for short-range air surveillance, counter-battery hearth and goal acquisition, and sensor networking. The requirement additionally required Block 1 to permit for incremental implementation of the next blocks with out tools or software program redesign. In 2009, a $14 million price overrun for the G/ATOR, attributed to necessities creep and rising price of scarce supplies required in superior digital parts. In 2012 the Marine Corps and Northrop Grumman started Block 2 growth, starting with upgrading the Block 1 tools and software program for performing GWLR necessities. The G/ATOR program obtained a profitable Milestone C resolution in March 2014. In October 2014, a 207.3 million greenback low fee preliminary manufacturing (LRIP) contract was awarded to Northrop Grumman for the primary lot of 4 techniques.
The 5 Marine Corps legacy radar techniques being changed by this multi-function functionality embody: the AN/TPS-63 (air protection), AN/TPS-73 (air-traffic management), AN/MPQ-62 (quick vary air protection), AN/TPQ-46 (counter-fire goal acquisition) and UPS-3 (goal monitoring). Moreover, it is going to increase the AN/TPS-59 long-range radar. The Program Govt Workplace (PEO), Land Techniques Marine Corps is executing the G/ATOR program as an evolutionary acquisition program consisting of 4 capabilities, known as blocks.
Block 1 will full the first materials system acquisition and may assist the short-range air protection and air surveillance mission.
Block 2 will embody software program to carry out the missions of floor counter-battery/hearth management.
Block 3 capabilities are usually not at present outlined or resourced, and have been deferred indefinitely.
Block 4 will present air visitors management capabilities (Expeditionary Airport Surveillance Radar).